|
Airport Markings //
SIZE MATTERS |
|
|
|
|
We’ve all heard the old adage, “you need the right equipment for the job”, it's very true. You wouldn't hire a contractor that paints houses with a toothbrush, or a landscaper that trims bushes with nail clippers. Imagine if you rented a golf cart, instead of a bus, to take your Little League team to the big game. It just wouldn’t work, would it? By the time you took two kids at a time, the game would be over.
When your facility needs to hire a runway striping contractor, make sure they've got the right equipment for the job. Choose Hi-Lite Markings, Inc., because…
|
 CONTRACTOR A The “Weekend Warrior” Parking Lot Striper
4” line Downtime to complete a 10,000 foot runway: 7 days
|
 CONTRACTOR B The “Highway” Striper
12” line Downtime to complete a 10,000 foot runway: 3 days |
HI-LITE MARKINGS, INC. The “Runway Striping Leader”
3 FOOT LINE Downtime to complete a 10,000 foot runway: 1 DAY |
|